Two engagements with the same national building materials distributor — one focused on operational accountability across 7 facilities, the other on network expansion to de-risk a single-facility dependency. Both produced measurable outcomes.
A national building materials distributor with 7 distribution centers and approximately 500 employees needed to close the gap between what leadership believed was happening and what was actually happening on the floor.
The Challenge
Results & Impact
Structured safety audits with weighted scoring and corrective action tracking drove sustained improvement across all 7 facilities.
Process standardization and accountability systems reduced product damage and inventory loss network-wide.
Operational efficiency improvements across receiving, stocking, pulling, and loading processes.
Methodology deployed network-wide with consistent audit standards, scoring, and corrective action pipelines.
The same national building materials distributor faced a critical concentration risk: one facility in Allentown handling the vast majority of volume, with its largest customer demanding supply chain protection.
The Challenge
Process & Project Steps
Results & Impact
Largest customer — representing 70% of DC volume — fully satisfied with the de-risking solution.
Eliminated 3rd-party trucking costs and overtime incentives by right-sizing each facility's workload.
Reduced inventory to safe levels — hazards, blocked aisles, and unstable stacking eliminated.
Beyond the Numbers
Amherst, NH DC significantly reduced transit times — customers now receive orders on time and in full.
Allentown and Amherst both have headroom to independently grow sales volume.
No single-facility dependency — the network is protected against disruption at either location.